Skip to main content
Past

Fort Riley

By July 20, 2022July 28th, 2022No Comments

FORT RILEY (FORT RILEY, KS)

This project included the abatement of ACM and universal wastes followed by the demolition of 120,000 square feet of structures including 3-story barracks constructed of concrete and block (due to their unique construction generally referred to as “Hammerhead Barracks”). Throughout the duration of the project, we recycled over 95% of the former construction materials thereby offsetting some of the project costs while also reducing waste materials requiring disposal. The project was completed in less than 180 days at a project cost of $580,000.

Project Reference: John Geary, Charter Environmental

fort riley