FORT RILEY (FORT RILEY, KS)

This project included the abatement of ACM and universal wastes followed by the demolition of 120,000 square feet of structures including 3-story barracks constructed of concrete and block (due to their unique construction generally referred to as “Hammerhead Barracks”). Throughout the duration of the project, we recycled over 95% of the former construction materials thereby offsetting some of the project costs while also reducing waste materials requiring disposal. The project was completed in less than 180 days at a project cost of $580,000.

Project Reference: John Geary, Charter Environmental